Adding people or machines changes nothing unless they go to the bottleneck, the place that holds everything up. Here are four examples that an AI simulated in earlier articles, showing what helped where: picking and packing, trucks waiting, inspection and parts supply. The AI used the tool it calls over MCP (sweep_process_parameters), and each figure is the mean of 20 runs. A water spider is the worker who brings parts to the assembly line.

1. What was added, and what came of it

ExampleSet-upWhat is measuredResult
A warehouse's afternoon shipping (a 15:45 cutoff)Four pickers, two packing stationsOrders missing the cutoff25.2 orders
A warehouse's afternoon shipping (a 15:45 cutoff)Four pickers, three packing stationsOrders missing the cutoff25.2 orders
A warehouse's afternoon shipping (a 15:45 cutoff)Six pickers, three packing stationsOrders missing the cutoff1.1 orders
A distribution centre's morning trucksOne person at reception, eight docksTime from arrival to unloading23.6 minutes
A distribution centre's morning trucksTwo people at reception, eight docksTime from arrival to unloading8.3 minutes
A distribution centre's morning trucksTwo people at reception, ten docksTime from arrival to unloading8.2 minutes
An assembly plant's first hour (11 orders)A 3-minute test, four AMRsOrders shipped10.8 orders
An assembly plant's first hour (11 orders)A 3-minute test, six AMRsOrders shipped10.8 orders
An assembly plant's first hour (11 orders)A 2-minute test, four AMRsOrders shipped11.0 orders
An assembly line (takt 60 seconds)One water spider, two kanban cardsLine stopped for lack of parts (total)60.8 minutes
An assembly line (takt 60 seconds)One water spider, three kanban cardsLine stopped for lack of parts (total)36.6 minutes
An assembly line (takt 60 seconds)Two water spiders, two kanban cardsLine stopped for lack of parts (total)0.0 minutes

2. What they show

  • Adding away from the bottleneck changes nothing. With four pickers, the warehouse still misses 25.2 orders with three packing stations; with two people at reception, the distribution centre's trucks still take 8.2 minutes with ten docks; and with a 3-minute test, the plant still ships 10.8 orders with six AMRs.
  • Adding at the bottleneck changes a lot. A second person at reception cuts the trucks' time from 23.6 minutes to 8.3, and a 2-minute test lets the plant ship all 11.0 orders.
  • When both are stuck, add to both. With six pickers and three packing stations, the warehouse misses 1.1 orders.
  • Add someone to supply parts rather than hide the shortage with more stock. With three kanban cards the line still stops for 36.6 minutes, but with two water spiders it stops for 0.0 minutes.

3. The articles

4. How to ask an AI

In this warehouse (as drawn), for the afternoon's shipping, compare the orders that miss the 15:45 cutoff with four to seven pickers and two or three packing stations, 20 runs each, and tell me where the bottleneck is.

5. What this does not cover

  • The orders and trucks that arrive, and the times to pick, pack, test and supply parts, are each article's assumptions. Replace them with your own site's records.