Laydyne

Office building layout software

Office buildings in 3D: the stairs, the fire equipment and the morning lifts.

Laydyne lets you inspect office-building stairs and fire equipment and compare lift demand. Use the same building model for the arrival rush, the lunch break and the drawings for review.

Start with a free account. Simulations are estimates and require Pro.

Office building: three storeys under 1,000 m²
3D model of Office building: three storeys under 1,000 m²
  • 21 × 15 mModel floor dimensions
  • 123Parts in the model
  • 22Articles with worked results

What you can do for this space

Office buildings · Lift demand

Try the building’s morning and lunchtime peaks.

Set floor populations, arrivals and lift operation for an approximate building day. Compare car availability or departure patterns to inspect queues and travel times.

  • Set arrivals by floor
  • Compare lift car availability
  • Test staggered lunch breaks

Results from worked examples

Lift demand: all articles for this use
Chart of the people the lifts carry up in five minutes: 34.1 with one car, 67.2 with two, 98.0 with three, 125.3 with four, with lines at 20 % (96) and 25 % (120)
How many lifts does an office building need for the morning rush?

Office buildings · Building checks

Review the stairs and equipment on each floor.

Specify use, structure and other required conditions for the office building. Inspect stair distances, openings and selected equipment criteria with each check’s assumptions and omissions.

  • Inspect routes to direct stairs
  • Review rescue windows and emergency lighting
  • Check selected fire equipment criteria

Results from worked examples

Building checks: all articles for this use
Plan of floor 3 of a small office building, 21 × 15 m, with the stair, toilets, kitchenette and a document store along the north, a corridor, and the office with eight islands of desks along the south
Which floors need an automatic fire alarm, and how many detectors?

Office buildings · Building visualization

Explain the building beyond a flat plan.

View the office building in 3D and select floors to inspect. Use the model to discuss the position of stairs, lift cores and occupied areas.

  • View the building in 3D
  • Inspect individual office floors
  • Review stair and lift positions
3D model of Office building: three storeys under 1,000 m²
Office building: three storeys under 1,000 m²

Office buildings · Building drawings

Prepare the floors for a technical review.

Choose the office floors to include in the drawing set. Export PDF or SVG plans with quantity sheets to share the drawn proposal.

  • Choose floors for the drawing set
  • Export floor plans as PDF
  • Add model quantity sheets to the PDF
Plan of Office building: three storeys under 1,000 m²
Office building: three storeys under 1,000 m²

Start with your space

  1. Open a model for free

    Open an office-building model and adapt its floors, stairs and lifts.

    Start from this model for free
  2. Ask your AI

    Ask the AI to inspect selected building criteria or compare lift demand.

    What fire safety does a three-storey office building need?
    This is a three-storey office building (307.84 m² per floor, 923.52 m² in total, one stair), with 15 people on each floor. List on which floors it needs extinguishers, automatic fire alarms, indoor hydrants, exit signs, escape devices, emergency lighting and a fire prevention manager.

    Quotation from Read the article

    How many lifts?
    In this building (as drawn, 60 people on each of floors 2 to 9), compare how many people the lifts carry up in five minutes in the morning with one to four cars, 20 runs each.

    Quotation from Read the article

    Does an office building need emergency lighting?
    This is a three-storey office building of 923.52 m² in total. Check which rooms and corridors on each floor need emergency lighting. The ground floor is the evacuation floor, with the south entrance. Tell me too whether lighting the corridor would make the meeting room exempt.

    Quotation from Read the article

  3. Check, export and share

    Review the conditions and findings, then export the floors for discussion.

Models you can start with

All ready models

Frequently asked questions

How long is the wait for the lifts at lunch in a nine-storey office?

With a staggered lunch, two lift cars bring the mean trip down to 1.6 minutes, close to the 1.7 minutes with four cars and everyone leaving at 12:00.

Read the article
Is one stair enough for an office building?

With a document store in place of a meeting room, the habitable rooms on the office building's floor 3 come to 188.24 m² to the walls' centres, within the 200 m² threshold for a quasi-fire-resistant structure, so one stair is enough.

Read the article

Your office building, built with AI.

Office building: three storeys under 1,000 m²

Start from this model for free

Articles for this use

Lift demand (4)

Building checks (18)

All articles