Retail store layout software
Store layouts in 3D, with the checkout queue and which shelves get seen.
Laydyne lets you edit a shop, compare checkout and fitting-room queues, and inspect shelf and camera views. Use the same model to discuss merchandising, replenishment and building checks.
Start with a free account. Simulations are estimates and require Pro.

- 10.4 × 15.4 mModel floor dimensions
- 39Parts in the model
- 28Articles with worked results
What you can do for this space
Shop access and facilities
Inspect exit widths, walking routes and the aisles between shelves.
Store operations
Compare checkout, fitting rooms and replenishment.
Retail building checks
Inspect selected Japanese building and fire criteria.
Shelves and cameras
Compare assumed shelf visibility and camera coverage.
Retail proposal
Present fixtures in 3D and export the layout and quantities.
Shops & supermarkets · Shop access and facilities
Connect the selling floor to its exits and facilities.
Measure the drawn shop and arrange shelves or facilities such as the AED. Inspect routes around shelves and walls when comparing exit access and aisle widths.
- Inspect shop exit widths
- Check walking routes to the AED
- Compare the aisles when shelves are added
Results from worked examples
- With two AEDs, one by the service counter and one by the swing door at the back, every point of the store is within a 60 m walk of an AED (58.66 m at most from the sales floor, 50.35 m from the back of house).
- With the added fire exit, the drugstore's exits are 5.3 m wide in all (automatic doors 2.4 m, back door 0.9 m, fire exit 2 m), more than the 5.12 m needed.

Shops & supermarkets · Store operations
Rehearse the rush around the actual fixtures.
Set shopper arrivals and service steps for an approximate trading period. Vary checkout lanes, fitting-room availability or replenishment staff and compare waits and work completed.
- Compare checkout staffing
- Test fitting-room capacity
- Change replenishment assignments
Results from worked examples
- With 6 lanes, only just enough for 180 shoppers an hour, one shared line made the mean wait 23.1 s longer (95% interval 13.7 to 32.5 s).
- With three checkouts, even four fitting rooms leave a checkout wait of 1.1 minutes, and the time in the store falls from today’s 19.3 to 10.8 minutes (8.4 minutes less, 95% interval 7.4 to 9.5).
- A second stock assistant cuts the time a fixture stays short from 34.0 minutes to 12.1 minutes, 21.9 minutes less (run for run, 95% interval 15.2 to 28.7).

Shops & supermarkets · Retail building checks
Review the shop use, windows and fire equipment.
Specify the retail use and building conditions needed by the checks. Inspect windows, occupant-load assumptions and selected equipment findings with their stated limits.
- Set the shop use and conditions
- Review window and occupant-load criteria
- Inspect selected fire equipment criteria
Results from worked examples
- Check whether each room of a shop with a high sales floor has windows high and wide enough to let smoke out under Japan's rules in force from November 2025, and what a room that falls short needs.
- As drawn, the 5,909.48 m² store is a windowless floor of 1,000 m² or more, so it needs sprinklers.
- A convenience store of 272.06 m² needs two extinguishers (2.72 units or more) and exit signs, but no fire alarm.

Shops & supermarkets · Shelves and cameras
Inspect what enters view on the shop floor.
Open the camera tool to inspect coverage, blind spots and people on camera. Open the gaze heatmap to compare shelves in visitors’ assumed view. The convenience store example includes a saved lunch-hour run.
- Compare shelf faces in assumed view
- Try alternative display-table positions
- Inspect camera blind spots
Results from worked examples
- The tobacco and lottery shelf behind the checkouts leads: all 85 shoppers face it as they queue.
- On a convenience store plan, six security cameras cover 91.9% of the sales floor, checkouts, entrance and ATM (weighted).
- In ten facilities counted on the plan, six cameras see 91.9% of a convenience store; in a warehouse, ten see 83.0% and sixteen see 94.3%.

Shops & supermarkets · Retail proposal
Put the shop-floor proposal in front of the team.
Inspect shelf and counter positions inside the store model. Export the floor plan and fixture schedule to discuss merchandising and fit-out changes.
- View the shop floor in 3D
- Export the retail plan as PDF
- Add fixture quantity sheets to the PDF

Start with your space
Open a model for free
Open a shop model and adapt its shelves, counters and service areas.
Start from this model for freeAsk your AI
Ask the AI to compare queues, replenishment or assumed shelf visibility.
Which shelves and fixtures do shoppers see?
In this shop's Saturday simulation (as drawn), list the ten fixture faces longest in shoppers' view on each floor, with a view of 120° and 6 m.
Quotation from Read the article
How many security cameras?
I want security cameras in this shop (as drawn). Weighting the door and the checkouts, how many do I need, and where, so that 90% of what must be seen is seen? Check, too, that the toilet and the staff room are not seen.
Quotation from Read the article
How do you cut the waits on a shop floor?
For this shop's Saturday (as drawn, two floors), compare the fitting-room and checkout waits and the time in the shop with two to four fitting rooms per floor and two or three checkouts, 20 runs each.
Quotation from Read the article
Check, export and share
Review shopper assumptions and building findings, then export the shop plan.
Models you can start with

Street-front shop: a high sales floor and its back rooms
A street-front shop of 10.4 × 15.4 m: a sales floor with a 3.0 m ceiling behind fixed display glass and an automatic door, sliding windows on its side, and at the back an office with a window, a staff room without one and a stock room under a 2.5 m ceiling, ready to check by Japan’s building order whether each room’s windows open high enough to let smoke out, and what a room short of it needs.
- Size
- 10.4 × 15.4 m
A free account is needed to start.

Roadside shop: a restaurant upstairs
A two-storey roadside building of 10 × 15 m on an 11 × 17 m lot fronting a 6 m road, 0.5 m from its neighbours on both sides: a shop behind its shopfront on the ground floor and a restaurant above with two windows to the road, two to a narrow side gap and a small toilet window high up, ready to check whether each floor is a windowless floor for Japan’s fire code and what windows would make it an ordinary one.
- Size
- 10 × 15 m, 2 levels
A free account is needed to start.

Convenience store
Shelving, chilled walls, checkout, back room and forecourt parking.
- Parking
- 7 parking stalls, 1 for wheelchair users
- Size
- 26 × 24 m
Opens in Studio without an account.

Supermarket
Aisles, fresh counters, checkout lanes, back of house and car park.
- Desks
- 2 desks in 1 islands, ready for the seat map
- Size
- 96 × 62 m
Opens in Studio without an account.

Saturday checkout
See where Saturday shoppers wait: the staffed lanes or the self-checkout pod.
- How many checkouts should be open?
- Where do the AEDs go, and how many? A minute's walk in a supermarket

Convenience store lunch rush
Watch a konbini lunch rush: registers, coffee, eat-in seats and restocking at once.
- How many people does a convenience store need at lunch?
- Which shelves do shoppers see at a convenience store’s lunch rush?
- How many security cameras does a convenience store need?

Convenience store cameras and shelf gaze
Explore six security cameras and the shelves in visitors’ assumed view, using a saved lunch-hour simulation in an editable convenience store.

Fitting rooms & tills (Saturday)
Size the fitting rooms and tills of a two-floor fashion store for a Saturday afternoon.
- How many fitting rooms and checkouts for a clothing store’s Saturday?
- Which fixtures do shoppers see in a clothing store on a Saturday?
- Where should the small gifts tables go in a clothing store?

Refilling the floor (Saturday)
See how long fixtures stay short on a Saturday with one or two stock assistants.
Explore example
Frequently asked questions
How many stock assistants?
A second stock assistant cuts the time a fixture stays short from 34.0 minutes to 12.1 minutes, 21.9 minutes less (run for run, 95% interval 15.2 to 28.7).
Read the articleHow many people does a convenience store need at lunch?
With two staff, putting both on the checkouts and letting one step away to restock cuts a shopper’s time from joining the queue to paying to 2.2 minutes, against 8.3 minutes with one cashier and one restocker.
Read the articleDoes a supermarket on a single storey of 5,909 m² need sprinklers?
As drawn, the 5,909.48 m² store is a windowless floor of 1,000 m² or more, so it needs sprinklers.
Read the articleWhere do the AEDs go, and how many?
With two AEDs, one by the service counter and one by the swing door at the back, every point of the store is within a 60 m walk of an AED (58.66 m at most from the sales floor, 50.35 m from the back of house).
Read the articleAre a shop's exits wide enough?
With the added fire exit, the drugstore's exits are 5.3 m wide in all (automatic doors 2.4 m, back door 0.9 m, fire exit 2 m), more than the 5.12 m needed.
Read the articleWhich shelves and fixtures do shoppers see?
At the convenience store, the tobacco and lottery shelf in front of the checkout queue was in view for 5,887 shopper-seconds; upstairs at the clothing store, the caps and wallets table in front of the fitting rooms was in view for 15,771.
Read the articleYour shop, built with AI.
Street-front shop: a high sales floor and its back rooms
Start from this model for freeArticles for this use
Shop access and facilities (3)
More shelves, narrower aisles
A synthetic two-level store gains eight shelves and keeps its stairs and floor opening.
Where do the AEDs go, and how many?
With two AEDs, one by the service counter and one by the swing door at the back, every point of the store is within a 60 m walk of an AED (58.66 m at most from the sales floor, 50.35 m from the back of house).
Are a shop's exits wide enough?
With the added fire exit, the drugstore's exits are 5.3 m wide in all (automatic doors 2.4 m, back door 0.9 m, fire exit 2 m), more than the 5.12 m needed.
Store operations (7)
How many checkouts should be open?
With 6 lanes, only just enough for 180 shoppers an hour, one shared line made the mean wait 23.1 s longer (95% interval 13.7 to 32.5 s).
How many fitting rooms and checkouts for a clothing store’s Saturday?
With three checkouts, even four fitting rooms leave a checkout wait of 1.1 minutes, and the time in the store falls from today’s 19.3 to 10.8 minutes (8.4 minutes less, 95% interval 7.4 to 9.5).
How many stock assistants?
A second stock assistant cuts the time a fixture stays short from 34.0 minutes to 12.1 minutes, 21.9 minutes less (run for run, 95% interval 15.2 to 28.7).
How many people does a convenience store need at lunch?
With two staff, putting both on the checkouts and letting one step away to restock cuts a shopper’s time from joining the queue to paying to 2.2 minutes, against 8.3 minutes with one cashier and one restocker.
How many desks, checkouts and staff?
At the hotel's front desk, 110 arrivals wait 69.3 minutes on average with one clerk and 2.0 minutes with two.
How do you cut the waits on a shop floor?
Three fitting rooms per floor cut the clothing store's time in the shop from 19.3 minutes to 15.2 minutes, but the checkout wait grows from 2.2 minutes to 6.1 minutes.
What can comparing two options tell you?
In all 3 examples one measure improved while another worsened: the shop's shelves rose from 12 to 20, but the minimum gap between them narrowed from 4.00 m to 1.40 m.
Retail building checks (12)
Can the windows of a high-ceilinged shop let smoke out?
Check whether each room of a shop with a high sales floor has windows high and wide enough to let smoke out under Japan's rules in force from November 2025, and what a room that falls short needs.
Is the restaurant upstairs a windowless floor?
Check whether each floor of a two-storey roadside shop has the openings Japan's fire code requires for firefighting, why the restaurant upstairs is a windowless floor, and what taller windows change.
Does a supermarket on a single storey of 5,909 m² need sprinklers?
As drawn, the 5,909.48 m² store is a windowless floor of 1,000 m² or more, so it needs sprinklers.
What fire safety does a convenience store of 272 m² need?
A convenience store of 272.06 m² needs two extinguishers (2.72 units or more) and exit signs, but no fire alarm.
How is occupant capacity counted under Japan's fire code?
Of ten facilities an AI counted, a banquet hall for 200 holds 2,054, an izakaya 54 and a convenience store 51.
How many extinguishers, and where?
Eleven facilities checked against Japan's extinguisher rules: a banquet hall of 1,262.06 m² needs 12.62 units, a convenience store of 272.06 m² 2.72, and an animal hospital of 210.04 m² needs none.
When is an automatic fire alarm required?
29 facilities: some uses need an alarm at any size, others from 300, 500 or 1,000 m².
Exit signs
Of 21 examples that need them on every floor, only a small café may; a convenience store 16.72 m from its farthest point cannot.
When does a building need indoor hydrants?
Indoor hydrants are needed from 500, 700 or 1,000 m² of total floor area by use, doubled or tripled if fire-resistant.
Which fire equipment does a building need?
Extinguishers, fire alarms, indoor hydrants and exit signs for 29 facilities an AI checked.
Windows for light, air and smoke, checked by an AI in six buildings
An office floor's reception opens 2.7 m² of window for air, just short of the twentieth of its floor it needs, 2.78 m².
Fire rules for tenant buildings and shops, in 5 examples an AI checked
Adding 1 extinguisher by the drugstore's west wall gives 12 extinguisher units and a farthest walk of 18.57 m, within 20 m.
Shelves and cameras (6)
Which shelves do shoppers see at a convenience store’s lunch rush?
The tobacco and lottery shelf behind the checkouts leads: all 85 shoppers face it as they queue.
Which fixtures do shoppers see in a clothing store on a Saturday?
On both floors, the fixtures in view the longest were those beside the places where shoppers wait: the checkout queue and the fitting-room lobbies; while they wait, shoppers stand facing the same way.
Where should the small gifts tables go in a clothing store?
Just inside the entrance (B), the socks and small gifts tables are in view of every shopper.
How many security cameras does a convenience store need?
On a convenience store plan, six security cameras cover 91.9% of the sales floor, checkouts, entrance and ATM (weighted).
How many security cameras?
In ten facilities counted on the plan, six cameras see 91.9% of a convenience store; in a warehouse, ten see 83.0% and sixteen see 94.3%.
Which shelves and fixtures do shoppers see?
At the convenience store, the tobacco and lottery shelf in front of the checkout queue was in view for 5,887 shopper-seconds; upstairs at the clothing store, the caps and wallets table in front of the fitting rooms was in view for 15,771.